COMMISSIONING: NEW INSTALLATION / NEW CONSTRUCTION CERTIFICATION
NFPA 70 - NEC NFPA 99 NFPA 99: Section 3 requires thorough inspection and performance testing of Isolated Power Systems after installation and prior to being placed into service. This inspection and testing must be conducted by field service professionals trained and equipped to do so. POWERSERVE works with distributors, installing electrical contractors, consulting engineering firms, and project managers to ensure proper Isolated Power System installation and pre-energization checkout. Included in this service is:
|
|